Construction of Nai Gaj Dam Project (Dadu-Sindh)
Nai Gaj Dam is an embankment dam on the Gaj River in the gorge area at the edge of Kirthar Mountains range at about 65 km (40 miles) north-west of Dadu city in Dadu District, Sindh Province of Pakistan. Location: The Nai Gaj Dam Project is being constructed aross Nai Gaj River, at latitude 26º 52'N and longitude 68º 19'E and is located 65 Km North-West of Dadu City in Sindh Province. Project Aerial View Name of Work Construction of Nai Gaj Dam Project (Dadu–Sindh) Country Pakistan Employer Water & Power Development Authority (WAPDA) Scope of Work Main Dam (194 ft) Dam Type 1,135 M (Length) 59 M (Height) Earth Core Rock Fill Dam Gross Storage Capacity Live Storage Capacity 300,000 AF 16,000 AF Bulk Excavation Rock Excavation 3,215,212 cum 8,563,944 cum Steel Reinforcement 19,164 Tons Concrete Lining 56,620 cum Earthen Dykes 9 No. Main Canal (10.53 Cumecs) 6.56 Km Distributaries 2 No 33 Km Minors 3 No 30 Km Spill way Structure 16,990 Cumecs Access Roads 19 Km Date of Award October 28, 2021 Date of Completion October 28, 2026 ...
Package-13: Rehabilitation and Improvement of Roads at District: Shaheed Benazirabad
Loan 4279-PAK(COL): Emergency Flood Assistance Project (Sindh Works & Services Department Component) Name of Work Package-13: Rehabilitation and Improvement of Roads in District Shaheed Benazirabad EFAP-13-SB2: Improvement / Rehabilitation of Road from 60th mile to connect 3 Chak via 68th mile and Chaudhary Nazeer Road (31.90 kms) Country Pakistan Employer Emergency Flood Assistance Project Works & Services Department Government of Sindh Date of Award December 06, 2023 Date of Completion December 06, 2026 ...
Package-1: Rehabilitation and Improvement of Roads at District: Thatta
Loan 4279-PAK(COL): Emergency Flood Assistance Project (Sindh Works & Services Department Component) Name of Work Package-1: Rehabilitation and Improvement of Roads at District: Thatta 1) EFAP-01-TH1: Reconditioning of Road from Makli to Ghulamullah - (15.27 km) 2) EFAP-01-TH2: Reconditioning of Road from Ghulamullah Pirpatho Road @ 2.21 kms to Mirpur Sakro Town - (20.22 km) 3) EFAP-01-TH3: Reconditioning of Road from Pirpatho Ghorabari Road @ 17.00 km of Soomar Manghrio Road to connect Var Mitho Shaikh Road via Misree Panhwar and M Papilo i/c links – (9.33 km) 4) EFAP-01-TH4: Reconditioning of Road from 105 Mori Shoro Stop @ 12.00 km Mureedani Chowk to Village Alam Jatt & Noor M Jatt, Paryo Jatt i/c links – (7.74 km) Country Pakistan Employer Emergency Flood Assistance Project Works & Services Department Government of Sindh Date of Award December 06, 2023 Date of Completion December 06, 2026 ...
Package-14: Rehabilitation and Improvement of Roads at District: Dadu
Loan 4279-PAK(COL): Emergency Flood Assistance Project (Sindh Works & Services Department Component) Name of Work Package-14: Rehabilitation and Improvement of Roads in District: DADU EFAP-14-DA2: Rehabilitation of Road from K.N Shah to Burira via Gozo (19.14 kms) EFAP-14-DA3: Rehabilitation of Road from Dadu to phulji to piaro kakar (34.58 kms) EFAP-14-DA4: Rehabilitation of Road from K.N Shah to Burira road (12.66 kms) Country Pakistan Employer Emergency Flood Assistance Project Works & Services Department Government of Sindh Date of Award March 23, 2024 Date of Completion December 23, 2026 ...
Package-18: Rehabilitation and Improvement of Roads at District: Shikarpur and Kashmore @Kandhkot
Loan 4279-PAK(COL): Emergency Flood Assistance Project (Sindh Works & Services Department Component) Name of Work Package-18: Rehabilitation and Improvement of Roads in District Shikarpur and Kashmore @Kandhkot. 1) EFAP-18-SH1: Rehabilitation of Road from Sukkur Larkana Road @ Kherthar Canal to Ghumro Village via Jhali Kalwari i/c links (16.17 kms) 2) EFAP-18-KA1: Rehabilitation 116 RFT Bridge over fall Garhi Hassan, Gahno Shakh near village Raheem Bux Kham Khoso Taluka Tangwani District Kashmore. Country Pakistan Employer Emergency Flood Assistance Project Works & Services Department Government of Sindh Date of Award December 06, 2023 Date of Completion December 06, 2026 ...
Dualization of Khuzdar – Kuchlak Section-1 (N25)
Name of Work Dualization of Kuzdar - Kuchlak Section-1 (N-25) (Km 00+000 to Km 51+120) Country Pakistan Employer National Highway Authority (NHA) Date of Award May 14, 2022 Date of Completion September 14, 2026 ...
Remodeling of Pat Feeder Canal Contract No. PFC/P-1
Name of Work REMODELING OF PAT FEEDER CANAL CONTRACT NO. PFC/P-1 (RD 0+000 to RD 33+224) Country Pakistan Employer Irrigation Department Balochistan (IDB) Date of Award August 02, 2024 Date of Completion August 01, 2028 ...
Remodeling of Pat Feeder Canal Contract No. PFC/P-2
Name of Work REMODELING OF PAT FEEDER CANAL CONTRACT NO. PFC/P-2 (RD 33+224 to RD 72+543) Country Pakistan Employer Irrigation Department Balochistan (IDB) Date of Award August 02, 2024 Date of Completion August 01, 2028 ...
Constructing J-Spur @ Mile 40/6, T-Head Spur – (Kore Ja Bhan)
Name of Work Constructing J-Spur @ Mile 40/6, T-Head Spur @ Mile 41/5+640, 3 No Studs, Stone Apron from Mile 40/6 to 41/5+640, Stone Pitching 40/6 to 41/5+640, and Strengthening Earthwork along S.M Mile 40/5 to 41/5 (Kore Ja Bhan) Country Pakistan Employer Rohri Division Kandiaro, Irrigation Dept. Govt of Sindh Date of Award June 11, 2024 Date of Completion June 11, 2027 ...
Improvement of Road from Sanghar to National Highway N5 (28 Kms)
Name of Work Improvement of Road from Sanghar to National Highway N5 at Point Rohri via Mundh Jamrao road Saleh Put Road (0.0 to 28.00 Kms) 28 Kms Country Pakistan Employer Work & Services Department Hyderabad. Date of Award February 17, 2025 Date of Completion September 30, 2026 ...
Improvement of road from Sanghar to National Highway N-5 (72 Kms)
Name of Work Improvement of road from Sanghar to National Highway N-5 at Point Rohri via Mundh Jamrao road Salehpat road (28.00 to 100.00 Kms) 72 Kms Country Pakistan Employer Work & Services Department Hyderabad. Date of Award April 09, 2025 Date of Completion September 30, 2026 ...
Rehabilitation of Road from Old N.H Way @ Mile 295/0 Jiskani (69.00 Kms)
Name of Work Rehabilitation of Road from Old N.H Way @ Mile 295/0 Jiskani To Choundiko Sangar Road Via Bagho Daro Bozdar Wada & Thari Mir Road (69.00 Km). Country Pakistan Employer Provincial Highway Division Khairpur Date of Award June 01, 2025 Date of Completion June 01, 2027 ...
Dualization of Mehran Highway from Nawabshah to Ranipur (135 Kms)
Name of Work Dualization of Mehran Highway from Nawabshah to Ranipur (135 Kms) Country Pakistan Employer Mehran Highway from Nawabshah to Ranipur Date of Award December 26, 2026 Date of Completion December 26, 2027 ...
Improvement of Road from Sanghar to National Highway N5 – (108 Kms)
Name of Work Improvement of Road from Sanghar to National Highway N-5 @ Point Rohri Via Mudh Jamrao Road - Salehpat From 100/00 To 208/00 (108 KM) Country Pakistan Employer Work & Services Department Hyderabad. Date of Award February 11, 2026 Date of Completion February 11, 2028 ...
Lyari Transformation Project Phase-I
Name of Work Lyari Transformation Project Phase-I Country Pakistan Employer Local Government & HTP Dept. Govt. of Sindh Date of Award February 11, 2026 Date of Completion August 11, 2027 ...
Construction of Dualization of Kuchlak – Zhob Section of N-50 Package-4
Name of Work Dualization of Kuchlak - Zhob Section Of N-50: Package-4: Nasai to Kanozai (Km 180+00 to Km 245+00) (65 Kms) Country Pakistan Employer National Highway Authority (NHA) Date of Award May 19, 2021 Date of Completion December 31, 2024 ...
M9-N5 Link Road Project on Public-Private Partnership Basis
PROJECT BRIEF 22 KM Road Concession period 25 years The approved alignment is to be slightly changed (options worked out already) as part of the alignment is crossing from unmarked army land, The project commenced as soon as alignment is approved. PROJECT DESCRIPTION The project is to dualize and rehabilitate the two-lane Link Road around 20 KM connecting Super Highway M-9 and National Highway N-5 on a new alignment under the PPP Mode. Objectives of the Project: The main objectives of this project are to provide an improved and safer route for traffic moving from National Highway, N-5 to the Superhighway, M-9 and vice versa and thereby avoid movement of traffic through congested areas in Malir, Bin Qasim and Landhi Towns and serve the growing traffic needs of the rapidly developing adjoining areas. Name of Work M9-N5 Link Road Project on Public-Private Partnership Basis Country Pakistan Employer Works & Services Department, Government of Sindh Date of Award May, 2022 Date of Completion May, 2047 ...
Dualization of Rawalpindi – Kahuta Road including 4-Lane Bridge
Inauguration: - Prime Minister performed ground-breaking of 12.5 billion rupees four lane 28 Km Rawalpindi-Kahuta Expressway. The road expansion, starting from Kaak Pul on the Islamabad Expressway, would include a 6 km long bypass at Sihala and a 9 km bypass at Kahuta, before linking with Azad Pattan road in Azad Jammu. The project would provide shortest route for traffic between Rawalakot, Kotli and twin cities of Rawalpindi and Islamabad, The project includes a four-lane fly-over at the Sihala railway crossing, Sihala and Kahuta bypass besides three bridge — Name of Work Dualization of Rawalpindi - Kahuta Road including 4-Lane Bridge over Sihala Railway Pass, Sihala Bypass & Kahuta Bypass, Package - II - Km 16+500 ~ Km 28+500 Country Pakistan Employer National Highway Authority (NHA) Date of Award August 17, 2022 Date of Completion December 31, 2024 ...