Nai Gaj Dam Project (Dadu-Sindh)

Nai Gaj Dam is an embankment dam on the Gaj River in the gorge area at the edge of Kirthar Mountains range at about 65 km (40 miles) north-west of Dadu city in Dadu District, Sindh Province of Pakistan. Location: The Nai Gaj Dam Project is being constructed aross Nai Gaj River, at latitude 26º 52'N and longitude 68º 19'E and is located 65 Km North-West of Dadu City in Sindh Province. Project Aerial View Name of Work Nai Gaj Dam Project Dadu – Sindh Country Pakistan Employer Water & Power Development Authority (WAPDA) Scope of Work Main Dam (194 ft) Dam Type 1,135 M (Length) 59 M (Height) Earth Core Rock Fill Dam Gross Storage Capacity Live Storage Capacity 300,000 AF 16,000 AF Bulk Excavation Rock Excavation 3,215,212 cum 8,563,944 cum Steel Reinforcement 19,164 Tons Concrete Lining 56,620 cum Earthen Dykes 9 No. Main Canal (10.53 Cumecs) 6.56 Km Distributaries 2 No 33 Km Minors 3 No 30 Km Spill way Structure 16,990 Cumecs Access Roads 19 Km Date of Award April, 2012 Date of Completion -- ...

River Training Works Guddu Barrage Kashmore ICB No. SBIP/G3

Project Aerial View Name of Work River Training Works Guddu Kashmore Contract: SBIP/G3 Country Pakistan Employer Sindh Barrage Improvement Project, Irrigation Department, Government of Sindh. Date of Award April, 2017 Date of Completion October, 2019 ...

Nai Gaj Dam Project (Dadu-Sindh)

Nai Gaj Dam is an embankment dam on the Gaj River in the gorge area at the edge of Kirthar Mountains range at about 65 km (40 miles) north-west of Dadu city in Dadu District, Sindh Province of Pakistan. Location: The Nai Gaj Dam Project is being constructed aross Nai Gaj River, at latitude 26º 52'N and longitude 68º 19'E and is located 65 Km North-West of Dadu City in Sindh Province. Project Aerial View Name of Work Nai Gaj Dam Project Dadu – Sindh Country Pakistan Employer Water & Power Development Authority (WAPDA) Scope of Work Main Dam (194 ft) Dam Type 1,135 M (Length) 59 M (Height) Earth Core Rock Fill Dam Gross Storage Capacity Live Storage Capacity 300,000 AF 16,000 AF Bulk Excavation Rock Excavation 3,215,212 cum 8,563,944 cum Steel Reinforcement 19,164 Tons Concrete Lining 56,620 cum Earthen Dykes 9 No. Main Canal (10.53 Cumecs) 6.56 Km Distributaries 2 No 33 Km Minors 3 No 30 Km Spill way Structure 16,990 Cumecs Access Roads 19 Km Date of Award April, 2012 Date of Completion -- ...