University Road from Hassan Square to NIPA Karachi (Karachi-Sindh)
Chief Minister Murad Ali Shah Inaugurates new Road at Hassan square Karachi Courtesy by 24 News Name of Work University Road from Hassan Square to NIPA Karachi. City/Country Karachi, Pakistan Employer/Client Local Government Department, Government of Sindh Contractor Sardar Muhammad Ashraf D. Baluch (Pvt) Ltd. (SMADB) Date of Award / Commencement Date December, 2016 Date of Completion June, 2017 ♦ Formation Width Project Limits Hassan Square to NIPA Main carriageway : 13.8 meter (Both Side) Service Road : 9.5 - 12.5 meter (R/S & L/S) Slip Road : 10.5 - 11.4 meter Central Median 4.0 meter Storm Water Drain 1.2 meter (Left Side) Storm Water Drain 1.85 (Right Side) ♦ Length of Road Project Length 3.200 km Main carriageway 2.2 km (Both Side) Service Road 2.2 km (Both Side) Slip Road 1.0 km (Both Side) ...

Dualization of Kuchlak – Zhob Section of N-50
Name of Work Dualization of Kuchlak - Zhob Section Of N-50: Package-4: Nasai to Kanozai (Km 180+00 to Km 245+00) (65 Km’s) Country Pakistan Employer National Highway Authority (NHA) Date of Award May, 2021 Date of Completion May, 2024 ...

M9-N5 Link Road Project on Public-Private Partnership Basis
PROJECT BRIEF 22 KM Road Concession period 25 years The approved alignment is to be slightly changed (options worked out already) as part of the alignment is crossing from unmarked army land, The project commenced as soon as alignment is approved. PROJECT DESCRIPTION The project is to dualize and rehabilitate the two-lane Link Road around 20 KM connecting Super Highway M-9 and National Highway N-5 on a new alignment under the PPP Mode. Objectives of the Project: The main objectives of this project are to provide an improved and safer route for traffic moving from National Highway, N-5 to the Superhighway, M-9 and vice versa and thereby avoid movement of traffic through congested areas in Malir, Bin Qasim and Landhi Towns and serve the growing traffic needs of the rapidly developing adjoining areas. Name of Work M9-N5 Link Road Project on Public-Private Partnership Basis Country Pakistan Employer Works & Services Department, Government of Sindh Date of Award May, 2022 Date of Completion May, 2047 ...

Dualization of Rawalpindi – Kahuta Road including 4-Lane Bridge
Inauguration:- Prime Minister performed ground-breaking of 12.5 billion rupees four lane 28 Km Rawalpindi-Kahuta Expressway. The road expansion, starting from Kaak Pul on the Islamabad Expressway, would include a 6 km long bypass at Sihala and a 9 km bypass at Kahuta, before linking with Azad Pattan road in Azad Jammu. The project would provide shortest route for traffic between Rawalakot, Kotli and twin cities of Rawalpindi and Islamabad, The project includes a four-lane fly-over at the Sihala railway crossing, Sihala and Kahuta bypass besides three bridge — Name of Work Dualization of Rawalpindi - Kahuta Road including 4-Lane Bridge over Sihala Railway Pass, Sihala Bypass & Kahuta Bypass, Package - II - Km 16+500 ~ Km 28+500 Country Pakistan Employer National Highway Authority (NHA) Date of Award January, 2019 Date of Completion -- ...

Construction of 2-Lane Highway from Basima to Khuzdar (N-30)
Name of Work Construction of 2-Lane Highway from Basima to Khuzdar (N-30) Country Pakistan Employer National Highway Authority (NHA) Date of Award November, 2019 Date of Completion November, 2021 ...

Sanghar to Khipro Via Chotiaryoon Tando Mitha Khan & Loon Khan Road Mile 1/1-16/4
Project Aerial View Name of Work: W/R Sanghar to Khipro Via Chotiaryoon Tando Mitha Khan & Loon Khan Road Mile 1/1-16/4 (With Asphalt Surface) Country: Pakistan Employer: Government of Sindh Provincial Highway Division Sanghar Scope of Work: Road Works & Stone Pitching. Date of Award: June, 2017 Date of Completion: June, 2019 ...

Sanghar to Khipro Via Chotiaryoon Tando Mitha Khan & Loon Khan Road Mile 16/4-33/0
Project Aerial View Name of Work: W/R Sanghar to Khipro Via Chotiaryoon Tando Mitha Khan & Loon Khan Road Mile 16/4-33/0 (With Asphalt Surface) Country: Pakistan Employer: Government of Sindh Provincial Highway Division Sanghar Scope of Work: Road Works & Stone Pitching. Date of Award: April, 2017 Date of Completion: April, 2019 ...

Construction of Road from Mithi Intersection to Naukot 42-KMs
Project Aerial View Name of Work Construction of Road from Mithi Intersection to Naukot (Upto ADB Project End Point) 42-KMS.) (ADP No.2233 of 2016-17) & Construction of Road Naukot, Jhuddo & Tando Jan Muhammad Bypasses (20-KMS.) (ADP No.2234 of 2017-17) – Package-A. Country Pakistan Employer Sindh Coal Authority, Government of Sindh, Date of Award January, 2017 Date of Completion January, 2020 ...

CPEC – Rehmani Khel to Kot Balian (Package-2B)
China-Pakistan Economic Corridor (CPEC) Western Route Hakla (on M-1) to D.I. Khan Motorway : Rehmani Khel to Kot Balian (Package-2B) Project Aerial View Name of Work China-Pakistan Economic Corridor (CPEC) Western Route Hakla(on M-1) to D.I. Khan Motorway : Rehmani Khel to Kot Balian (Package-2B). Country Pakistan Employer National Highway Authority (NHA) Date of Award May, 2017 Date of Completion November, 2018 ...

University Road from Hassan Square to NIPA Karachi (Karachi-Sindh)
Chief Minister Murad Ali Shah Inaugurates new Road at Hassan square Karachi Courtesy by 24 News Name of Work University Road from Hassan Square to NIPA Karachi. City/Country Karachi, Pakistan Employer/Client Local Government Department, Government of Sindh Contractor Sardar Muhammad Ashraf D. Baluch (Pvt) Ltd. (SMADB) Date of Award / Commencement Date December, 2016 Date of Completion June, 2017 ♦ Formation Width Project Limits Hassan Square to NIPA Main carriageway : 13.8 meter (Both Side) Service Road : 9.5 - 12.5 meter (R/S & L/S) Slip Road : 10.5 - 11.4 meter Central Median 4.0 meter Storm Water Drain 1.2 meter (Left Side) Storm Water Drain 1.85 (Right Side) ♦ Length of Road Project Length 3.200 km Main carriageway 2.2 km (Both Side) Service Road 2.2 km (Both Side) Slip Road 1.0 km (Both Side) ...

Package ICB-SPRIP-02-Sheranpur to Ratodero Road Improvement Project (Ratodero-Sindh)
Name of Work Package ICB-SPRIP-02, Construction for the Improvement of Road Sheranpur to Ratodero (36 KMS). Country Pakistan Employer Project Director, Sindh Provincial Roads Improvement Project (SPRIP), Works & Services Department, Hyderabad, Sindh. Date of Award October, 2016 Date of Completion December, 2018 ...

ICB-SPRIP-05: Tando Mohammad Khan to Badin Road Improvement Project (Badin-Sindh)
Name of Work ICB-SPRIP-05: Tando Mohammad Khan to Badin (67 Km) Sindh Provincial Road Improvement Project. Loan No. 3305-Pak. Country Pakistan Employer Sindh Provincial Roads Improvement Project (SPRIP) Date of Award October, 2016 Date of Completion January, 2019 ...

Yakmach – Kharan Road, Section-I, Kharan – Shahi Ghari (Kharan-Baluchistan)
Name of Work Construction of Yakmach - Kharan Road, Section-I, Kharan - Shahi Ghari from KM 0+000 to 50+000 (50 Km) Country Pakistan Employer National Highway Authority (NHA) Date of Award March, 2015 Date of Completion Oct, 2021 ...

Construction of Right Guide Bund, J-Spur and Protection Bund Around Amri Village: (Amri Qazi Ahmed Bridge Project) (Nawabshah-Sindh)
Name of Work Construction of Right Guide Bund, J-Spur and Protection Bund Around Amri Village: (Amri Qazi Ahmed Bridge Project) Country Pakistan Employer National Highway Authority (NHA) Date of Award April, 2016 Date of Completion April, 2017 ...

Improvement/Rehabilitation of Larkana Naudero Lakhi Road (Larkana-Sindh)
Name of Work Improvement / Rehabilitation of Larkana Naudero Lakhi Road Country Pakistan Employer National Highway Authority (NHA) Scope of Work Length 31 Km Improved Sub-grade 623,000 cum Borrow pit sand 618,000 cum WBC 107,000 cum Asphalt Base 168,800 cum Wearing Course 13,400 cum Steel 70 Tons Date of Award March, 2012 Date of Completion December, 2013 ...

Rehabilitation of Sarhad Bypass to Dharki Road N-5, Contract No. NCB-S-02 (Ghotki-Sindh)
Name of Work Rehabilitation of Sarhad Bypass to Dharki Road N-5 Contract NCB -S-02 KM - (522 - 576) Country Pakistan Employer National Highway Authority (NHA) Scope of Work Borrow 33,000 cum Sub-Base 2,000 cum Aggregate 2,000 cum Asphaltic Base 12,000 cum Wearing Course 9,000 cum Gold Milling (0-17 CM) 21,000 cum Concrete 6,325 cum Steel 625 Tons Date of Award March, 2012 Date of Completion December, 2013 ...

Improvement of Provincial Highway from Padedan Road-Jalalji Chowdagi to Akri Contract No.P3 (Matiari-Sindh)
Name of Work Improvement of Provincial Highway from Padedan Road - Jalaji Chowdagi to Akri (28 Km) Contract No. P3 Country Pakistan Employer Works and Services Department (GOS) Scope of Work Length of Project 28 Km Borrow fill 10,000 cum Sub Base 27,000 cum Aggregate Base Course 40,500 cum Asphaltic Base 25,500 cum Wearing Course 110,000 cum Grouted / Stone Pitching 15,500 cum Date of Award October, 2012 Date of Completion June, 2014 ...

Construction of Gwadar–Ratodero Road Project (M-8) Section – IV (Wangu Hills Reach) (41.840 Kms)
Project Ariel View Name of Work Construction of Gwadar – Ratodero Road Project (M-8) Section – IV, Khuzdar Shahdadkot Package-IV (Wangu Hills Reach) Km 84+500 to Km 125+66 BK/117+500 AHD (41.840 Kms) Country Pakistan Employer National Highway Authority (NHA) Date of Award April, 2004 Date of Completion November, 2011 ...

Nawab Shah Padedan Road Contract No. P2 (Nawabshah-Sindh)
Name of Work Nawab Shah Padedan Road, Contract No.P2 Country Pakistan Employer Works and Services Department, Government of Sindh Date of Award November, 2005 Date of Completion September, 2013 ...

Construction of Approach Road from Left Abutment of the Bridge to Qazi Ahmed (N-5) Package-II (Nawabshah-Sindh)
Name of Work Construction of Approach Road from Left Abutment of the Bridge to Qazi Ahmed (N-5) Package-II Country Pakistan Employer National Highway Authority (NHA) Scope of Work Length of Guide Banks 22 Km Guide Banks 2 No. Granular Sub base 87,129 cum Aggregate Base 80,696 cum Asphaltic Base Course 10,859 cum Asphaltic Wearing Course 6,814 cum Earthwork 1,869,385 cum Rip Rap 62,263 cum Date of Award March, 2010 Date of Completion April, 2015 ...

Construction of Approach Road for Bridge Over River Indus Connecting District Larkana with Khairpur, Right Guide Bank and J-Spur (Larkana-Sindh)
Name of Work Construction of Approach Road for Bridge Over River Indus connecting District Larkana with Khairpur (22 KM), Right Guide Bank and J-Spur. Country Pakistan Employer National Highway Authority (NHA) Scope of Work Earthwork & Rock 1,937, 194 cum Concreting 195 ,064 cum Reinforcement 139, 538 Tons W.C. Crossing 14 N0's Date of Award January, 2009 Date of Completion December, 2013 ...

Development & Rehabilitating of M.A Jinnah Road (Karachi-Sindh)
Name of Work Development & Rehabilitating of M.A Jinnah Road from Jinnah Bridge end to Keamari Intersection (Karachi-Sindh) Country Pakistan Employer Karachi Port Trust (KPT) Consultant NESPAK Scope of work Length of Road = 3.5 Km Flyover = 1 No. (800M) Date of Award September, 2004 Date of Completion July, 2008 ...

Gwadar Ratodero Road Project Section-I, Package-2B, Gwadar to Turbat (Gwadar-Baluchistan)
Name of Work Gwadar Ratodero Road Project Section-I, Package-2B (Gawadar to Turbat) Km 100+800 to Km 164+250) - 63.45 Km Country Pakistan Employer National Highway Authority (NHA) Consultant -- Scope of Work Total Bridges 13 No. Length of Bridges 2,260 Meter Concrete Works 4,175 Cu.m Girders 220 No. Approx 2,640 Cu.m Piles Length 9,912 M dia 1200 mm Approx 11,200 Cu.m Date of Award July 2004 Date of Completion June 30, 2011 ...

Construction of Makran Coastal Highway Ormara-Pasni Section, Sub-Section-III (Ormara-Baluchistan)
Ormara is a town in Gwadar District in Baluchistan province of Pakistan. It is a port city located in the Makran coastal region. It is located 360 kilometres west of Karachi and 230 kilometres east of Gwadar on the Arabian Sea. Name of Work Construction of Ormara-Pasni Section of Makran Coastal Highway Project, Ormara-Pasni Section, Sub-Section-III (Km 102+081) to Km 152+112) Country Pakistan Employer National Highway Authority (NHA) Consultant Indus Associated Consultants Date of Award January ,2003 Date of Completion June, 2004 Scope of work: Carriageway 50 Km's Box Culvert 143 No's. Bridges 10 No's ...

Dual Carriageway, Rahim Yar Khan to Trinda Muhammad Panah Contract No. N-5 (Rahim Yar Khan-Punjab)
Name of Work Dual Carriageway, Rahim Yar Khan to Trinda Muhammad Panah (N-5). Country Pakistan Employer National Highway Authority (NHA) Consultant NESPAK Date of Award July, 2000 Date of Completion July, 2003 Scope of Work 13 Km Long Dual Carriageway 7.30 Meter Wide i. Borrow fill 213,700 cum ii. Sub-Base 67,930 cum iii. Aggregate Base 59,900 cum iv. Asphalt Base Course 50,500 cum v. Wearing Course 9,670 cum vii. Pipe Culverts 10 No's ...

Indus Highway Project Manjhand to Sehwan Contract No.N-55 (Jamshoro-Sindh)
Name of Work Indus Highway Project, Manjhand to Sehwan Contract N-55. Country Pakistan Employer National Highway Authority (NHA) Consultant i. Pacific Consultants Internationals ii. Engineering Associates Ltd. Date of Award July, 1995 Date of Completion May, 1999 Scope of work i. Earthwork 1,354,500 cum ii. Box Culverts 160 No's. iii. Overhead Bridges 4 No's ...

Malir River Bridge at Korangi Road (Karachi-Sindh)
Name of Work Malir River Bridge at Korangi Road and along the 3 Split Levels Expressway, Improvement of Shaheed-e-Millat Road Extension. Country Pakistan Employer Karachi Development Authority (KDA) Consultant i) A.A Associates ii) Umer Munshi Associates Date of Award September, 1988 Date of Completion September, 1992 Scope of work 1.6 km long pre-stressed concrete Bridge and 03 km long split - level expressway Total Piles = 476 No. Stone Pitching = 60,000 Cu ...